Our mining operations are currently hosted in our 650m² Norwegian data centre.

The Data Centre is powered using 100% renewable electricity with a connection to a hydroelectric power plant just a short distance away.

Coupled with this, the Data Centre is positioned at the foot of a large glacier. This unique positioning means that the data centre benefits from glacier cooled and stable air which benefits the air-to-air cooling system and contributes to a PUE as low as 1.1

Our data centre has redundant fibre with several entry conduits delivering resilient and reliable low latency Internet connectivity to our mining platform.